Mihai Viteazu Wind Farm
Provided Service
Construction Design Geotechnical Engineering
Sector
Industrial Facilities
Location
Constanța
Publishing date
30 June 2011
Provided Service
Construction Design Geotechnical Engineering
Sector
Industrial Facilities
Location
Constanța
Publishing date
30 June 2011
6 wind turbines
2.3MW installed capacity / turbine
84 m high tower
71 m rotor diameter
Steel structure
Direct raft foundation / reinforced concrete piles foundation, depending on soil conditions