The Green Court Bucharest complex comprises three office buildings (A, B, C) and was built in three distinct development phases: Phase 1 – building infrastructure A and B, building superstructure A, Phase 2 – building superstructure B, building infrastructure C , Phase 3 – superstructure building C. Vertically, the ensemble consists of three basements, ground floor and twelve floors, the last floor having technical functionality, the total above-ground height being about 54.15 meters.
Real estate developments, be they office buildings, residential or commercial, involve, especially within large urban agglomerations, the need to build a large number of basements, so deep excavations. The requirements to design more economical and practical solutions to support excavations lead to the need for a better understanding of the behavior of the support system.
The project addressed state-of-the-art technological and design solutions for our country, including a 60 cm thick buried wall enclosure supported by a row of post-tensioned anchors, the implementation of the BIM working system and the “Safety by design” “, the adoption of emerging products on the Romanian construction market, such as mechanical devices to ensure the continuity of reinforcement, special mandrels made of high-strength stainless steel specific for taking over differentiated settlements between buildings and making metal coupling rulers up to a height of 2.5 m of sheets with a thickness of 40 mm.
Address
4 Gara Herăstrău Street
Modern design and execution practice provides for the need for preliminary field tests and structural monitoring both in the execution phase and in the operation phase. The risks associated with these works are significantly reduced by careful and correct monitoring of the designed structures and neighboring buildings, allowing early intervention in the event of negative developments in travel.
Based on the results of the preliminary tests performed in the field – in this case, the tests on the field anchors – the work can be resized.
However, as part of the support system had already been implemented at the time of the test anchors, redesign could only be allowed with certain limitations. Therefore, it may be recommended that this be taken into account in the initial design phases.
Therefore, it may be recommended that this be taken into account in the initial design phases. The tests and measurements were included in a specialized study that led to the optimization of the calculation model, thus reducing execution costs.
The BIM working model is, without a doubt, a system that has more and more demand and will be imposed primarily by foreign investors. This system reduces design costs and eliminates errors that were only discovered in the execution phase in the past.
Description
The Skanska Group started its investments in Romania by developing on a site in the northeast of Bucharest a set of office buildings, with a height of 3 Basements, Ground floor and 11 (12) floors, with a total area of approx. 95,000 sqm, of which about 60,000 sqm in the above-ground part of the buildings. The basement covers almost the entire surface of the property while the three above-ground buildings occupy approximately 60% (according to authorized urban indicators) of the land area.
Features
Gross Overground Area:
Gross Area:
Number of Storeys:
Maximum Height:
60 000 sqm
95 000 sqm
3B+GF+11F+TehF
54
Challenges
BIM system work; Support molded wall enclosure post-tensioned anchors; "Safety by Design" system; adoption of emerging products - mechanical devices to ensure continuity of reinforcement, high-strength stainless steel mandrels for taking over differentiated settlements
Description
The Skanska Group started its investments in Romania by developing on a site in the northeast of Bucharest a set of office buildings, with a height of 3 Basements, Ground floor and 11 (12) floors, with a total area of approx. 95,000 sqm, of which about 60,000 sqm in the above-ground part of the buildings. The basement covers almost the entire surface of the property while the three above-ground buildings occupy approximately 60% (according to authorized urban indicators) of the land area.
Features
Gross Overground Area:
60 000 sqm
Gross Area:
95 000 sqm
Number of Storeys:
3B+GF+11F+TehF
Maximum Height: