Provided Service
Construction Design
Technical Consulting
Publishing date
26 September 2022
The future shopping mall will have 3 buildings: T1 (commercial spaces and offices), T2 and T3 (commercial spaces).
When we took over this project (DE phase), the reinforced concrete resistance structure, the façade and part of the interior partition walls of the buildings T2 and T3 were executed.
We realized the technical documentation for the continuation of the works with theme modification.
The superstructure has a regular, rectangular shape, the two buildings having many similarities regarding the structure composition. The differences between the two bodies consist in the built area and the size of an opening.
The structural system of the buildings is made entirely of reinforced concrete (prefabricated and monolith).
Features
Gross Area:
Number of Storeys:
Features
Gross Area:
20.000 sqm
Number of Storeys:
GF+1F
Address
284 Chitilei Road